Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Mid-County Library Hurricane Repairs
Last Updated: 03/07/2024 Category: County Facilities Current Phase: Planning and Project Approval
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Last Updated: 03/07/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
GC Herring Phase II design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 03/07/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 03/07/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Last Updated: 03/06/2024 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Various Intersection Improvements
Last Updated: 03/06/2024 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Cape Haze Wastewater Expansion
Last Updated: 03/06/2024 Category: Utilities Category: Utilities Current Phase: Planning and Project Approval
This project proposes construction of a wastewater collection system to service approximately 500 properties with sewer service, new water service lines and a station that will provide sewer collection for the wastewater system.South Gulf Cove Bridge Repairs - Construction
Last Updated: 03/06/2024 Category: Bridges Current Phase: Construction
South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)Last Updated: 03/05/2024 Category: Roadway Current Phase: Planning and Project Approval
Flamingo/Edgewater Widening